A phased adoption checklist that minimizes risk from pilot to enterprise-wide rollout.
Successful adoption starts with a single-module pilot, confirms measurable outcomes, then expands into adjacent modules.
- 1Pilot: scope to a single module and a single site.
- 2Validate: measure core KPIs (close lead time, working capital) over 30 days.
- 3Expand: add adjacent modules and integrate roles/SSO.
- 4Operationalize: standardize runbooks and alert thresholds.
Integrate roles and SSO during the expansion phase. Start the pilot with least privilege.